|
Project[s] |
Client |
Consultant |
Main Contractor |
Nature of work |
1 |
BDF at Hamla Airbase |
M/s. Bahrain Defense Force |
M/s. Ministry of works /BDF |
M/s. Al Fouz Contracting |
Erection of ‘Kirby’ Pre-engineered Steel Building and related structure
Fireproof Paint – Supply & Application of ‘Jotun’ Fireproof paint. |
2 |
STS Tatweer |
M/s STS Tatweer |
In house Consultant |
Ahmed Mansoor Al AAli |
Erection of “Kirby” Pre-engineered Steel Building and Roof Replacement and Re-Fixing of Roof Sheets |
3 |
Quick Service Manama |
Yk Almoayyed |
In-House Consultant |
M/s. EVER TECH CONTRACTING W.L.L. |
Bitumen waterproofing and Roof Repair Works |
4 |
Quick Lane Arad |
Yk Almoayyed |
In-House Consultant |
M/s. EVER TECH CONTRACTING W.L.L. |
Gutter Repairing and Roof Repair Works |
5 |
Aker Warehouse |
Yk Almoayyed |
In-House Consultant |
M/s. EVER TECH CONTRACTING W.L.L. |
Roof Repairing Works and Gutter Replacement |
6 |
Bahrain Int’l Airport [New Jet A1 Fuel Farm] |
BAC [Bahrain Airport Co] |
Mott Macdonald |
Amana Pipeline / Mesmack Ltd. |
Erection of Kirby PEB, Fabrication & Installation of various steel structure |
7 |
Showroom Building at Sitra |
Hassan Al Shababi |
In-House Consultant |
M/s. EVER TECH CONTRACTING W.L.L. |
Erection of Zamil PEB & Installation of Sandwich Panel |
8 |
BDC Kitchen |
BAS |
DTEBi |
Saleh Al Kameshki |
Erection of Kirby PEB & Fireproof Painting. |